Features

Everything You Need to Build With Confidence

Four phases, one app. Rivo carries your project from first sketch to final inspection.

Plan

Start with a plan you can actually build to

Rivo turns your project into a roadmap with real numbers attached — so you know the cost and the calendar before you spend a dollar.

Project roadmap

Every phase laid out in build order, start to final inspection.

Budget

Line-item costs for materials, permits, rentals, and contingency.

Timeline

Weekend-by-weekend scheduling based on your real availability.

Task planning

Break big phases into tasks you can finish in a session.

Project Roadmap

16' x 20' Patio Cover

Phoenix, AZ · Budget $12,846

Design & measureDone
Permit submittedIn review
Footings & postsNext
FramingNot started

Prepare

Show up to the job site with everything you need

Quantities calculated from your dimensions, permits explained in plain English, and a tool plan that doesn't blow the budget.

Material lists

Exact quantities with waste factored in, by phase.

Shopping

Lists grouped by store so one trip actually covers it.

Permit guidance

Prepare permit-ready documentation for your jurisdiction. Questions? Ask an Expert.

Tool recommendations

Buy, rent, or borrow — with cost comparisons.

Materials & Shopping List

Framing phase

Permit ready
  • 6x6 posts (8 ft)6$312
  • 2x8 rafters18$864
  • Concrete mix22 bags$154
  • Post bases6$138
  • Structural screws3 boxes$96

Build

Guidance that meets you where you're standing

No more scrubbing through a 40-minute video for the one detail you need. Rivo gives you the next step, and only the next step.

Step-by-step instructions

Sequenced for your project, not a generic tutorial.

Progress tracking

Know exactly what's done and what's next — and ask an expert if you want a second opinion.

Safety reminders

Surfaced at the moment they matter most.

Step 7 of 24 — Set Posts

Set and plumb the posts

Drop each 6x6 into its base, brace in two directions, then check plumb on adjacent faces before the concrete sets.

Safety reminder

Keep braces on until concrete has cured a full 24 hours.

Progress29%

Verify

Catch the mistake before the inspector does

Check Your Work walks each phase against the details inspectors actually look for — so you close walls with confidence.

Check Your Work

Phase-by-phase verification built into the build. If something needs another look, Ask an Expert.

Inspection readiness

A pre-inspection pass before you make the call.

Quality verification

Photo-guided checks on the details that fail.

Check Your Work

Framing inspection readiness

3 of 4 checks passed

  • Post depth meets footing spec
  • Hardware matches approved plan
  • Ledger flashing installed
  • Rafter spacing within tolerance
Fix the rafter spacing before you call it in — it's the most common first-time failure on this project.

Rivo is built so you can finish the job yourself. And if you ever want a second opinion, Ask an Expert is there in the step you're on.

Build with all of it in one place.

Build with Rivo.

Rivo is opening to a small founding group first. Add your name and we'll reach out.

Get Early Access

No spam. Ever. Unsubscribe anytime.