Projects

What Are You Building?

34+ project types with real plans, real costs, and real permit guidance behind them.

10 projects

Outdoor

Backyard builds that add usable living space and real resale value.

Patio Cover

Shade structure tied into your existing roofline or freestanding posts.

Intermediate2–4 weekendsPermit required
Learn More

Need another opinion? Ask an Expert

Pergola

Open-rafter structure over a patio, deck, or walkway.

Beginner1–2 weekendsPermit likely
Learn More

Need another opinion? Ask an Expert

Outdoor Kitchen

Framed island with counters, grill cutout, gas, and power.

Advanced4–8 weeksPermit required
Learn More

Need another opinion? Ask an Expert

Deck

Footings, framing, decking, and railing built to code.

Intermediate2–5 weekendsPermit required
Learn More

Need another opinion? Ask an Expert

Fence

Post layout, setting, and panel installation along a property line.

Beginner1–3 weekendsPermit likely
Learn More

Need another opinion? Ask an Expert

Pool

Planning, permitting, and contractor coordination for a new pool.

Expert2–4 monthsPermit required
Learn More

Need another opinion? Ask an Expert

Fire Pit

Paver or block fire feature with proper clearances.

Beginner1 weekendUsually no permit
Learn More

Need another opinion? Ask an Expert

Landscaping

Grading, beds, irrigation, and planting plan.

Beginner1–4 weekendsUsually no permit
Learn More

Need another opinion? Ask an Expert

Retaining Wall

Engineered block or poured wall that holds back grade.

Advanced2–4 weekendsPermit required
Learn More

Need another opinion? Ask an Expert

Shed

Slab or skid foundation, framing, siding, and roofing.

Intermediate2–4 weekendsPermit likely
Learn More

Need another opinion? Ask an Expert

9 projects

Interior

Room-by-room upgrades where sequencing and budget control matter most.

Kitchen Remodel

Layout, cabinets, counters, appliances, and finish work.

Advanced6–12 weeksPermit likely
Learn More

Need another opinion? Ask an Expert

Bathroom Remodel

Demo, waterproofing, tile, fixtures, and vanity.

Advanced3–6 weeksPermit likely
Learn More

Need another opinion? Ask an Expert

Laundry Room

Hookups, venting, cabinetry, and a workable layout.

Intermediate1–3 weeksPermit likely
Learn More

Need another opinion? Ask an Expert

Flooring

Subfloor prep and install for LVP, tile, or hardwood.

Intermediate1–2 weeksUsually no permit
Learn More

Need another opinion? Ask an Expert

Drywall

Hanging, taping, texture, and paint-ready finishing.

Intermediate1–2 weeksUsually no permit
Learn More

Need another opinion? Ask an Expert

Painting

Prep, priming, and finish coats inside or out.

Beginner2–5 daysUsually no permit
Learn More

Need another opinion? Ask an Expert

Built-ins

Custom shelving, benches, and cabinetry sized to the room.

Intermediate1–3 weekendsUsually no permit
Learn More

Need another opinion? Ask an Expert

Home Office

Desk build, lighting, added circuits, and sound control.

Intermediate1–3 weeksUsually no permit
Learn More

Need another opinion? Ask an Expert

Fireplace

Insert, surround, hearth, and clearance-compliant framing.

Advanced1–3 weeksPermit required
Learn More

Need another opinion? Ask an Expert

8 projects

Structural

Bigger moves that almost always need permits and inspections.

Garage Conversion

Insulation, framing, egress, and finishing to living space.

Advanced6–10 weeksPermit required
Learn More

Need another opinion? Ask an Expert

ADU

Accessory dwelling unit from plan set through final inspection.

Expert4–9 monthsPermit required
Learn More

Need another opinion? Ask an Expert

Room Addition

New footprint, foundation, framing, and tie-in to the existing house.

Expert3–8 monthsPermit required
Learn More

Need another opinion? Ask an Expert

Roofing

Tear-off, underlayment, flashing, and new roof covering.

Advanced1–2 weeksPermit required
Learn More

Need another opinion? Ask an Expert

Windows

Replacement or new openings with proper flashing.

Intermediate2–7 daysPermit likely
Learn More

Need another opinion? Ask an Expert

Doors

Interior, exterior, and patio door installs.

Beginner1–2 daysUsually no permit
Learn More

Need another opinion? Ask an Expert

Concrete

Forms, rebar, pour, and finish for slabs and walkways.

Advanced1–2 weekendsPermit likely
Learn More

Need another opinion? Ask an Expert

Foundation

Footings, stem walls, drainage, and repair or new pours.

Expert2–6 weeksPermit required
Learn More

Need another opinion? Ask an Expert

7 projects

Mechanical

Systems work where codes, load calcs, and inspections drive the plan.

HVAC

Equipment sizing, ductwork, and replacement planning.

Advanced1–2 weeksPermit required
Learn More

Need another opinion? Ask an Expert

Mini Split

Line set, mounting, and commissioning for ductless zones.

Intermediate1–2 daysPermit likely
Learn More

Need another opinion? Ask an Expert

Plumbing

Supply lines, drains, venting, and fixture rough-in.

Advanced2–10 daysPermit required
Learn More

Need another opinion? Ask an Expert

Water Heater

Tank or tankless swap with venting and gas or electrical.

Intermediate1 dayPermit likely
Learn More

Need another opinion? Ask an Expert

Electrical

Circuits, subpanels, and device work to code.

Advanced1–7 daysPermit required
Learn More

Need another opinion? Ask an Expert

Solar

Array layout, racking, interconnection, and utility approval.

Expert4–12 weeksPermit required
Learn More

Need another opinion? Ask an Expert

EV Charger

Dedicated circuit and Level 2 charger installation.

Intermediate1 dayPermit likely
Learn More

Need another opinion? Ask an Expert

Whatever you're building, build with Rivo

Build with Rivo.

Join the founding builder list and get Rivo on your next project.

Get Early Access

No spam. Ever. Unsubscribe anytime.